Sunday, April 12, 2009

Periwinkle is Home

Periwinkle arrived back at Collingwood last Saturday (April 4th). All her interior has been repaired and updated. The teak and teak veneer have been refinished and the electrical, electronics, and the upholstery have been replaced. We are now busy sanding and repainting the bottom and polishing the hull to prepare her for launch on May 3rd. Once the boat is in the water, her new refrigeration and solar panel will be installed. If only the weather will cooperate.